Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Board Of Aldermen - Agenda - 9/9/2020 - P269

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P269

Vanasse Hangen Brustlin, Inc.

Water Street. This could be done by converting the western segment of Water Street
to a pedestrian corridor/park. This conversion to a pedestrian corridor could be
relatively straight forward as the existing western segment of Water Street could be
closed to vehicular traffic and converted. Figure 17 shows a concept of what Water
Street could look like as a pedestrian corridor.

Figure 17: Water Street Pedestrian Corridor

Board Of Aldermen - Agenda - 9/9/2020 - P268

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P268

@ Vanasse Hangen Brustlin, Inc.

Board Of Aldermen - Agenda - 9/9/2020 - P267

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P267

@ Vanasse Hangen Brustlin, Inc.

* SIGNALIZED CONCEPT ROUNDABOUT CONCEPT |
Figure 15: Walnut Street Oval Northern Consolidation Alternatives

Board Of Aldermen - Agenda - 9/9/2020 - P266

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P266

\Wwhb\profiBedlonS2700.00 Nashua
Circulation Studyireports\Final ReportFinal
Report docx

Vanasse Hangen Brustlin, Inc.

Sas Ey SL,

ROUNDABOUT CONCEPT

Figure 14: Walnut Street Oval Southern Consolidation Alternatives

30

Board Of Aldermen - Agenda - 9/9/2020 - P265

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P265

@ Vanasse Hangen Brustlin, Inc.

signal or roundabout in the southern or northern portion of the oval, and
reconfiguring the Oval using two roundabouts.

& eet” |

‘High Street

School Street
eS

West Peari Street
= — I

Chestnut Street
Walnut Street

ht

Pl + = | ,

ty to Cedar. Streat,

i = =

th mst rya |
Figure 13: Walnut Street Oval Grid Pattern Circulation Alternative

Board Of Aldermen - Agenda - 9/9/2020 - P264

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P264

@

Vanasse Hangen Brustlin, Inc.

Alternatives
Evaluation

Board Of Aldermen - Agenda - 9/9/2020 - P263

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P263

3/7/2013

; be ded ee a vo
ee a

ee RS 1
i: i a |

tur Toe y

nee Aa |

in . ake i | - :

zy , ee aa t S ee k«
‘Qe Wr Pearl'Street “*—

he

as
hy

tit tae, a
pit a 7

—

Cri Pee

%
i ‘=
cf . , b ] i th DS * s s 3 | F = as = mS
aye : sa Worcester Street
uel) A} 7 a
AL

A : ; } -
2

Sl) Sa

ors.

‘ i ag |
Se
2 rl oe

if cM he

mY. he at
a + Femail }:
yen _— =
4

ee

Board Of Aldermen - Agenda - 9/9/2020 - P262

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P262

\whthprofiBedondS2700 00 Nashua
Circulation Study\reports\Final ReportFinal
Report docs

@

27

Vanasse Hangen Brusilin, Inc.

Street, Palm Street, and will be provided along the soon-to-be completed Broad Street
Parkway.

Board Of Aldermen - Agenda - 9/9/2020 - P261

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P261

@

Vanasse Hangen Brusilin, Inc.

2.4 Existing Conditions Summary

\\Whb\pro/\Bedion?\§2700.00 Nashua
Circulation StudyireportsiFinal RaportiFinal
Raportdocx

26

Board Of Aldermen - Agenda - 9/9/2020 - P260

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P260

3/5/2013 \\nh-bed\projects\52700.00 Nashua Circulation Studyicad\ts\planset\ReportFigures.dgn

Y

Pine Street

Palm Street —»>

Myrtle Street

Central Street

=_

Ash Street

—_>

Vine Street

z« 6 W. Hollis Street

Chestnut Street ~<—

ee ee a

Pagination

  • Previous page ‹‹
  • Page 2463
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact