Finance Committee - Agenda - 2/2/2022 - P126
PRESERVATION COMPANY
DETAILED COST BREAKDOWN
EAST HOLLIS STREET AND BRIDGE STREET IMPROVEMENT PROJECT - FINAL DESIGN
NASHUA, NH
PRESERVATION COMPANY
DETAILED COST BREAKDOWN
EAST HOLLIS STREET AND BRIDGE STREET IMPROVEMENT PROJECT - FINAL DESIGN
NASHUA, NH
INDEPENDENT ARCHAEOLOGICAL CONSULTING, LLC
DETAILED COST BREAKDOWN
EAST HOLLIS STREET AND BRIDGE STREET IMPROVEMENT PROJECT - FINAL DESIGN
NASHUA, NH
December 1, 2021
SANBORN, HEAD & ASSOCIATES, INC.
DETAILED COST BREAKDOWN
EAST HOLLIS STREET AND BRIDGE STREET IMPROVEMENT PROJECT - FINAL DESIGN
NASHUA, NH
December 1, 2021
2.1.17.4b - Sample Salary Rate Calculation
SALARY RATE CALCULATION FORM
Consultant Name:
McFarland Johnson
Project/Contract: #
16314
Date:
9/30/2021
Proposed Indirect Cost Rate for this Contract
179.73%
McFARLAND JOHNSON, INC.
DETAILED COST BREAKDOWN
EAST HOLLIS STREET AND BRIDGE STREET IMPROVEMENT PROJECT - FINAL DESIGN
NASHUA, NH é, >
December 1, 2021
McFARLAND JOHNSON, INC.
DETAILED COST BREAKDOWN
EAST HOLLIS STREET AND BRIDGE STREET IMPROVEMENT PROJECT - FINAL DESIGN
NASHUA, NH ‘ >
December 1, 2021
PM SPE PE SE AE JE ST TOTAL DIRECT
TASK _TASK DESCRIPTION $60.00 | $58.56 | $53.52 | $43.62 | $36.66 | $30.35 | $35.65 | HOURS LABOR
PHASE 2 PRELIMINARY DESIGN
McFARLAND JOHNSON TEAM
COST SUMMARY
EAST HOLLIS STREET AND BRIDGE STREET IMPROVEMENT PROJECT
FINAL DESIGN
NASHUA, NH
December 1, 2021
TOTAL FEE BREAKDOWN
Exhibit C
McFarland-Johnson Team Fee Detail
Christine Perron
September 27, 2021
for analysing MSATs in a NEPA document; 1) No Meaningful MSAT effects; 2) Low Potential MSAT effects;
3) High Potential MSAT effects.
For projects with low potential MSAT effects, a qualitative assessment (Phase | analysis) of emissions
projections will be conducted in accordance with Appendix B and Appendix C of the FHWA guidance. For
projects with no meaningful MSAT effects, no formal analysis is required.
Christine Perron
September 27, 2021
Ozone: The 1-hour 1979 and 8-hour 1997 ozone standards have since been revoked and the area was
recently reclassified as unclassifiable/attainment for ozone.
Particulate Matter: The study area is located in an EPA designated attainment area for particulate matter
(PMio and PM25s); therefore, PMio and PM25s Transportation Conformity requirements do not apply for
projects located in Hillsborough County.