material remaining in the bottom of the trench 1s not disturbed.
If pipe is to be laid in embankments or other recently filled areas, the fill
material shall first be placed to a height of at least 12-inches above the top of
the pipe before excavation.
Pipe trenches shall be made as narrow as practicable and shall not be widened
by scraping or loosening materials from the sides. Every effort shall be made to
keep the sides of the trenches firm and undisturbed until backfilling has been
completed.