Finance Committee - Agenda - 7/6/2022 - P25
ITEMS NOT INCLUDED
1. More meetings than identified in basic and additional services.
2. Construction drawings and specifications. (Note: At this time the City has not
defined the scope or method of project delivery, or its phasing, which would dictate
the criteria of scope and extent of these construction documents}. Segments 3, 4, 6
& 11-14 all other drawings and specs.
3. Changes to the final engineering designs that are a result of issued state, federal or
city permit conditions.