Board Of Aldermen - Agenda - 9/28/2020 - P186
\Wwhbprof\Bextterd$27100.00 Nashua
Circulation Studyreparts\Final ReporfiFinal
Report.docx
46
Vanasse Hangen Brustlin, Inc.
Factory Street
\Wwhbprof\Bextterd$27100.00 Nashua
Circulation Studyreparts\Final ReporfiFinal
Report.docx
46
Vanasse Hangen Brustlin, Inc.
Factory Street
\Wwhtipro/iBemon\S2 700.00 Nashua
‘Ciroulabon Study\raports\Final ReportFinal
Report dock,
@
45
Vanasse Hangen Brustlin, fic.
Study Findings
@ Vanasse Hangen Brustlin, Inc.
* Maintain one-way operation East Hollis Street and East Pearl Street, but
convert Spring Street to two-way.
* Consider any circulation modifications within the context of future land
development projects.
These and many other comments and suggestions were considered in the
development of the Study Findings.
Viwhbiprof BedlorhS2700.00 Nashua AA
Chreulalion Study\eporis\Final Report\Final
Report.doc
Alternatives Evaluation
@
Vanasse Hangen Brustlin, Inc.
BY ed
3-4 Seconds Remainder of Time
moe Sa
oo
Figure 25: Concurrent Pedestrian Crossing with Early Release
3.2 Public Outreach Process
\whbprof\BedlonfiS2700.00 Nashua
Circulation Studyreports\Fingl ReportFinal
Report.darx
43
®
Vanasse Hangen Brustlin, Inc.
Figure 24: Concurrent Pedestrian Crossing
A comparison of exclusive pedestrian phasing to concurrent pedestrian phasing is
summarized as follows:
@ Vanasse Hangen Brustlin, Inc.
Street. Connection to Pearson Street would be maintained through the existing
parking lot. Prior to the City advancing the conversion to two-way flow along Court
Street and Park Street it would be advantageous to work with the owner of the 30
Temple Street property to consider whether a reconfiguration of the Court
Street/Temple Street intersection could be coordinated with any development
proposal.
B 3.1.8 Pedestrian Signal Phasing
@ Vanasse Hangen Brustlin, Inc.
existing condition with use of concurrent pedestrian crossings, even with the added
signal phase for the Spring Street approach that reduces existing intersection capacity
by four to seven percent during the peak hours.
B 3.1.7 Park Street and Court Street
\whibiprof\Bedion#i52700.00 Nashua,
Circulation Study\reports\Final ReportiFinal
Repart.dacs
@
Vanasse Hangen Brusilin, Inc.
» Traffic signal controller cabinet modifications to provide southbound Spring
Street traffic signal phasing (proposed to be split from Medical Center Drive’s
green indications given the moderately high volume of conflicting Spring Street
left-turn to Medical Center Drive through and right-turn movements).
B 3.1.6
@ Vanasse Hangen Brustlin, Inc.
Spring Street
\Wwhbipro/\Bediond\S2700 00 Nashua
‘Circulation StudyireportsiFinal RaportFinal 38
Report docx
Under the Spring Street 1-way to 2-way conversion alternative, the portion of Spring
Street between East Hollis Street and East Pearl Street would be transitioned from
existing 1-way northbound to 2-way traffic flow. This alternative is illustrated in
@ Vanasse Hangen Brustlin, Inc.